LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) JADUAL KEDUA BAGI CADANGAN PROJEK “PROPOSED WASTE TO ENERGY PLANT (WTE) ON PT 10195 [ORIGINAL PT 9806 (LOT 12) AND PT9807(LOT 11)], KAWASAN PERINDUSTRIAN BENTONG FASA 2B, MUKIM SABAI, DAERAH BENTONG, PAHANG DARUL MAKMUR”

Language : Multi
Date Released : April 10, 2023
Consultant : Chemsain Konsultant Sdn Bhd
Project Propernant / Developer : ND Paper (Malaysia) Sdn Bhd
Location : Mukim Sabai, Daerah Bentong,Pahang Darul Makmur
Category : Others
Keyword : LAPORAN PENILAIAN KESAN KEPADA ALAM SEKELILING (EIA) JADUAL KEDUA BAGI CADANGAN PROJEK “PROPOSED WASTE TO ENERGY PLANT (WTE) ON PT 10195 [ORIGINAL PT 9806 (LOT 12) AND PT9807(LOT 11)], KAWASAN PERINDUSTRIAN BENTONG FASA 2B, MUKIM SABAI, DAERAH BENTONG, PAHANG DARUL MAKMUR”
Author : Muhammad Alif Haikal bin Muhamad Asri
Date Post : 11/04/2023
Rating :
0 votes
Bookmark :

Attachments


You might be intrested in..

Share on:

Paparan terbaik menggunakan IE9 keatas / Mozilla Firefox 11 ke atas dan Google Chrome, resolusi 1280 x 720. EKMC@

Share on:
Enviro Knowledge Center